1 owner background
2 project address, location map, city GDP, pillar industry, import and export, consumption level, tourist quantity, etc.
3 peripheral traffic, distance from the airport, train station, port
4 project appearance photos
5 drawing information (general plan of the building, the floor plan of each floor, it is best to have the electronic version of CAD map, building elevation, profile, equipment and building body effect diagram)
6 land use nature, the use of starting time
7 the total construction area and the functional area of the construction area of the breakdown: rooms, conference, catering, entertainment, leisure, etc.
8 the number of floors, each functional area division: floor containing the number of guest rooms and room number, room number, room number, room number KTV, sauna room, etc.
9 function rooms, each room is composed of net area
10 major mechanical and electrical equipment, and brand, quantity
11 floor standard
12 parking spaces
13 current room rates and rental rates (in particular the contracting class operations in the hotel)
14 rent, deposit, the cooperation period, increasing the proportion of the decoration period, the main business conditions freeperiod
|
area
field
set
position
|
1 to the Pearl River Delta, the Yangtze River Delta, the Bohai economic circle around the mature regional business climate center, such as Beijing, Tianjin, Shanghai, Shenzhen, Guangzhou
2 important second tier cities such as Shenyang, Dalian, Nanjing, Suzhou, Hangzhou, Wuhan, Chongqing, Chengdu,, Xiamen, Foshan, Zhuhai, etc.
Three 3 lines below the city: after the completion of the city is the best hotel in the local
|
base
book
strip
piece
|
1 location is the primary condition of the local business, business core area, close to business, business, attractions, exhibition, large transportation hub, large recreation center, mature economic development zone and other tourist market
2 property belonging to the business, the hotel industry, the comprehensive use of the property or the owners can apply for a licence to transform the old property
Room number 3: 120-500, hotel volume 8000-60000 square meter
4 is suitable for the hotel industry, or can be transformed according to the hotel standard
5 from the airport, train station, bus station and other traffic hub port, drive control in 30 minutes; 10 minutes walking distance to MTR station; traffic flow, without fences (or fence openings), two-way traffic, road project signs, traffic signs are easy to reach
6 have good visibility, guests can see the hotel sign in the distance as far as possible. The best is the "Golden Horn silver edge" (Crossroads), advertising; the street is better, the bustling commercial district in May, but preferably not more than 50 meters away from the intersection, with driveway at the door
7 the entrance lobby has vehicle drop off area, can be installed awning, guest access, staffentrance, access to the goods / refuse entrance to located on the first floor, and try to separate.
8 parking spaces: fixed parking spaces for the number of rooms more than 40%, the ground needs at least 30 temporary parking spaces, other parts of the parking space
9 infrastructure
Water: 0.5 tons / room, the main water inlet pipe diameter 100mm above (preferably with an underground pool of more than 150 cubic capacity)
Electricity: not less than 315KVA, at least 2KVA/, if there is a sauna facilities to increase the calculation, it is best to municipal two-way access
Gas: Municipal access
Telephone: Municipal access
Heating: Municipal access (northern region)
Internet connection: access
Sewage: directly connected with the municipal sewage pipe network
Passenger elevator: General principles for the guests to the average waiting time of 25-30 seconds, during the peak period of not more than 50 seconds
At least one of the 100 rooms shall be equipped with an elevator at least; speed 1.6-2.5M/S
At least 1 of the staff elevator service / service elevator lobby and elevators; separate goods ladder
Depending on the distribution of the logistics function area
10 hot water boiler: equipped with; if not, to have the installation location (the production of hot water according to 150L/ calculation between the room with bath room by 200L/)
Central air conditioning: equipped with; if not, to have the installation location, or you can install split air conditioning (Configuration Standards: Hall 250W/ square meters in the restaurant, the conference room 300W/ square meters of public area 200W/ square meters room 120W/ square meters)
Smoke: can meet the local fire acceptance criteria (qualified fire acceptance documents)
Spray: can reach the local fire control acceptance criteria (qualified fire acceptance documents)
Fire alarm system: equipped with (qualified fire acceptance documents)
Monitoring system: equipped with, to ensure that all guest rooms and access to the channel, the entrance, the public area; host with UPS power supply, working time is not less than 30 minutes (to the local public security configuration requirements)
Standby generator: equipped with; if not, there are installation area and area (the minimum generator capacity to ensure that the requirements of the electrical equipment in addition to the electrical equipment)
Storey height: length and width: the lowest storey corridor ceiling height of not less than 2.5m; the lowest hanging room entrance porch is not less than 2.1m; the highest room space is not less than 2.6m or the minimum standard decided by local fire
Corridor width: room corridor net width of the minimum in the 1.5m~1.8m range; corridor elevator hall minimum net width of not less than 2.2m; or by the local fire standards determine the minimum value
11 minimum net size of room decoration: net length of not less than 7000mm, net width of not less than 3600mm
Side length of the side of the bed (toilet wall to the side wall of the window) 4500mm
Health length is not less than 2.0M, the width is not less than 2.4M
Reserved chest width of not less than 0.55M
|